Capricorn Municipal

Development Guidelines

   



 

Home
Up

 

 

Capricorn Municipal Development Guidelines

Drawings & Specifications

 

 
  Design Specifications
   

Home Up

Design Specification Design Specification Link Last Amendment Amendment Description
D1 D1 - Road Design

Issue No. 7- Jan 2017

  • IRC requirements added.

D2 D2 - Pavement Design

Issue No. 3 - September 2014

  • Asphalt thickness amended in D2 Pavement Design Specification

D3 D3 - Bridges

Issue No. 2 - March 2012

  • Austroads reference amended

D4 D4 - Subsurface Drainage

Issue No. 2 - March 2012

  • Use of strip drain as well as slotted pipe permitted

D5 D5 - Stormwater Design

Issue No. 4 - Jan 2017

  • IRC Requirements Added.

D6 D6 - Site Regrading

Issue No. 2 - March 2012

  • Formatting changes

D7 D7 - Erosion Control and Stormwater Management

Issue No. 2 - March 2012

  • Reference to level spreaders removed

D9 D9 - Cycleway and Pathway Design

Issue No. 2 - March 2012

  • Austroads reference amended
  • Minimum pathway width amended from 1.0m to 1.2m and for dual use pathways from 2.0m to 2.5m in Table D9.05.01
  • Horizontal clearances amended in Table D9.05.01
D11 D11 Water Reticulation

Rev G - Jan 2017

  • IRC Requirements Added

D12 D12 Sewerage Reticulation

Rev H - Jan 2017

  • IRC Requirements Added

 

Top of Page

 

 

 

 

Disclaimer                                Date Last Modified 08/03/2017 - Website best viewed at 1024 x 768 pixels   | Home